This interim mitigation procedure provides Fisheries and Oceans Canada's (DFO) national guidance on the implementation of planning and implementing riparian zone re-vegetation when conducting works, undertakings and activities (projects) on land, near water.

On this page

1.0 About this procedure

A mitigation procedure specifies how to implement a specific mitigation measure to achieve its objective and maximize its effectiveness. This mitigation procedure provides national guidance from Fisheries and Oceans Canada (DFO) on how to implement the following mitigation measure:

It is intended for use in planning and implementing riparian zone re-vegetation when conducting works, undertakings and activities (projects) on land, near water.

By following this mitigation procedure, project proponents can reduce the risk of harmful impacts to fish and fish habitat to an acceptable level. When the affected riparian zone occurs within critical habitat of species at risk, ensure alignment with the Species at Risk Act (SARA) by referring to species-specific recovery strategies during re-vegetation plan development.

The riparian zone is defined as the area located between a water body's ordinary high water mark (OHWM) and the upland area. The width of the riparian zone may be further defined by provincial, territorial or municipal regulations or guidelines. The riparian zone has unique physical, geomorphological, and chemical properties that support fish habitat (meaning, functions) by providing habitat structure and cover, water temperature regulation, food supply, contaminant and excess nutrient uptake, bank stabilization, noise and light buffering, and wood recruitment and is sensitive to environmental change. Activities that occur in the riparian zone may have direct and indirect effects on fish and fish habitat.

Riparian re-vegetation is a mitigation measure used when riparian zones associated with fish bearing waters are temporarily disturbed or changed by works, undertakings, and activities (projects), such as construction of new infrastructure or maintenance or removal activities associated with existing projects (for example, bridge, culvert, or outfalls), and bank stabilization.

2.0 User guide

Mitigation procedures are one of a suite of tools used by the Fish and Fish Habitat Protection Program (FFHPP) to manage the risk of harmful impacts to fish and fish habitat from projects carried out in or near water. They create efficiencies in the regulatory process by standardizing requirements for certain types of common projects.

Mitigation procedures are not considered stand-alone documents. The conditions under which they can be applied, other applicable management measures (for example, carry out the project in accordance with timing windows), and any engagement or consultation requirements are dictated by the instrument within which it is referenced (for example, Fisheries Act Authorization).

DFO, as part of the Crown, is bound under Section 35 of the Constitution Act, 1982 to uphold and respect the full spectrum of Indigenous rights. DFO also has a duty to consult and accommodate Indigenous Peoples when carrying out Crown conduct or a decision, such as a Fisheries Act authorization. Input from Indigenous Peoples, including Indigenous Knowledge, when provided, plays a vital role in regulatory decision-making. Indigenous input and knowledge may offer insights into Aboriginal and treaty rights, increase understanding of potential risks, impacts and concerns, and inform the design of avoidance and mitigation measures. Proponents should consider this in determining their approach to mitigating risks to fish and fish habitat from projects and incorporate these into their application for authorization regardless of the approaches outlined in the mitigation procedure.

Project proponents can indicate their intention to follow one or more DFO mitigation procedures in their application for authorization (PDF, 1.1 MB). Submission should indicate specific sections of the mitigation procedures that apply to the proposed project and include any additional site-specific management measures related to the method used.

The type of riparian zone and site-specific conditions will often inform the preferred method(s) for re-vegetation following disturbance or changes to the existing riparian vegetation. Some examples include:

All aspects of this mitigation procedure are expected to be applied by, or in consultation with, a qualified environmental professional with demonstrated re-vegetation expertise and experience relevant to the project type and project location.

Mitigation procedures do not remove nor replace the obligation to comply with all applicable statutory and regulatory requirements of the Fisheries Act, the Species at Risk Act, the United Nations Declaration on the Rights of Indigenous Peoples Act, or other federal, provincial, territorial, or municipal legislation and policy including guidance regarding species and habitats managed by these jurisdictions.

Up-to-date information on DFO mitigation procedures can be found on the Projects near water website.

3.0 Methods

This riparian re-vegetation mitigation procedure is structured in four phases and associated sub-steps within each phase:

3.1 Baseline information and planning

3.1.1 Baseline Information

Collect baseline information about the site and surrounding area to be re-vegetated including pre-project elevation, slope, aspect, soil properties, drainage class, rooting depth and restrictive layers, water table and seepage, and native vegetation (for example, species, density, structure) to inform the re-vegetation plan.

3.1.2 Planning

When planning work that may occur in the riparian zone and any post-construction re-vegetation activities, it is important to take into account the overall objective of avoiding risks to fish and fish habitat before considering mitigating for project activities. Re-vegetation should be part of the overall plan to retain or replace functions provided by the riparian zone when risks are expected.

To ensure adequate planning, riparian zone re-vegetation should be carried out through an inclusive process, actively involving local Indigenous communities in planning activities, such as the selection of plant species. The participation of Indigenous communities can help preserve and enhance local biodiversity and strengthen the ecological sustainability of re-vegetation efforts, while respecting their rights as stewards of the land. This collaboration also promotes social acceptability of projects by integrating traditional knowledge adapted to regional ecosystems.

3.2 Site preparation

Prepare the site according to specifications identified in the re-vegetation plan to create optimal conditions for plants to establish quickly, improve survivorship, deter invasive plant establishment, and provide riparian functions to fish habitat with minimal lag time.

3.2.1 Plant salvage

Salvaging native plants prior to disturbance helps preserve natural plant diversity and reduce project costs.

3.2.2 Soil salvage

Salvaging soil helps conserve healthy soil in the re-vegetation area by maintaining nutrient cycling, organic material, soil microbes, and plant propagules.

3.2.3 Invasive plant management

The appropriate management of invasive plants during site preparation is critical to limit the potential for recolonization post-planting.

3.2.4 Site stabilization

Erosion control and site stabilization helps prevent sediment and other deleterious substances from entering aquatic habitat. Refer to the interim mitigation procedure: Planning for land-based erosion and sediment control.

3.2.5 Planting medium

Providing an appropriate planting medium reduces transplant stress and facilitates survivorship and healthy plant growth.

3.3 Planting

Install plants according to the re-vegetation plan, which should include specifications for:

The re-vegetation plan may also specify features to enhance habitat complexity and measures to protect newly established plantings.

3.3.1 Species selection

Selecting species that are appropriate for the re-vegetation area and sourced locally can improve plant survival and support the objectives of the re-vegetation plan.

3.3.2 Plant establishment

Factors, such as plant spacing and quantity, are important to ensure plants have adequate access to suitable growing conditions (meaning, sunlight, water, nutrients) especially during plant establishment. The proper approach allows plants to thrive, reduces competition and susceptibility to pests and disease, and minimizes the need for maintenance.

3.3.3 Schedule

Timing re-vegetation activities is important to improve survivorship of installed plants and minimize transplant stress in addition to reducing invasive plant colonization.

3.3.4 Protection

Planning for protection of the re-vegetation area and individual plants from human disturbance (for example, along frequently used trails, road or utility right of ways, and parks) and animal disturbance (for example, animal browse, livestock trampling) may need to be considered based on site conditions and should be identified in the re-vegetation plan.

3.4 Monitoring and maintenance

Re-vegetation success will be assessed through monitoring and maintenance. Regular monitoring will identify maintenance needs, contingency measures to address deficiencies, and compared to criteria developed during planning to determine expected outcomes have been achieved.

3.4.1 Monitor the re-vegetated area

3.4.2 Maintain the re-vegetated area

Glossary

Contingency measures

Secondary actions implemented if the primary measures, such as avoidance, mitigation, or offsetting measures, fail to meet their expected outcomes.

Erosion

The wearing of soil from by wind, water, or gravity.

Expected outcome

States the required result of a management measure and is used to:

  • establish a clear linkage to the policy objective
  • frame the effectiveness science and monitoring

For example, survivorship of planted material within the re-vegetation area will be 100% for trees and 80% for shrubs at the end of Year 5 post construction; A minimum of 5 native species of trees and shrubs will be present in the re-vegetation area with at least 10% aerial cover of each species; Invasive plant species aerial cover will not exceed 10% cover during each monitoring year post construction.

Marine environment

Comprises all ocean, coastal waters and estuaries, including intertidal zones and salt water marshes, and extending, in the case of watercourses, up to the freshwater limit.

Ordinary high water mark

The usual or average level to which a body of water rises at its highest point and remains for sufficient time so as to change the characteristics of the land. In flowing waters (for example, rivers and streams) this refers to the 'active channel/bank-full level' which is often the 1:2 year flood flow return level. In inland lakes, wetlands or marine environments, it refers to those parts of the water body, bed and banks that are frequently flooded by water, leaving a mark on the land. It's where the natural vegetation changes from predominately aquatic vegetation to terrestrial vegetation (excepting water tolerant species). For reservoirs this refers to normal high operating levels (meaning, full supply level).

Qualified environmental professional

A person experienced in identifying and analyzing the risks to fish and fish habitat generated from various works, undertakings or activities conducted in or near water, and implementing management measures to avoid and mitigate these risks. They possess a post-secondary degree or diploma in biological, geophysical or environmental sciences and are referred to as:

  • applied scientists
  • aquatic biologists
  • environmental consultants
  • fisheries biologists
  • fisheries technicians
  • fluvial geomorphologists
  • natural resource consultants
Reference site

A natural or minimally disturbed area, in close proximity to the disturbed site and with similar ecological features that acts as a benchmark or model for assessing, restoring, or managing ecosystems.

Riparian zone

Area located between a water body's ordinary high water mark and upland area. The width of the riparian zone may be further defined by provincial, territorial or municipal regulations or guidelines.

This is a cross section of the area where water meets land for a lake, wetland, or marine environment. Aquatic vegetation can be found growing on the bed of the water body and are either fully submerged, or partially emerging, from the current water level. Trees, shrubs, and plants are shown at and above the ordinary high water mark of the shoreline which is depicted by a dotted line slightly above where the water meets land.

This is a cross section of the area where water meets land for a lake, wetland, or marine environment. Aquatic vegetation can be found growing on the bed of the water body and are either fully submerged, or partially emerging, from the current water level. Trees, shrubs, and plants are shown at and above the ordinary high water mark of the shoreline which is depicted by a dotted line slightly above where the water meets land.

Page details

Date modified: