Isolated or Dry Open-cut Stream Crossings
For the purpose of this Operational Statement, the term "Isolated
Crossing" means a temporary stream crossing technique that
allows work (e.g., trenched pipeline or cable installation) to be
carried out "in-the-dry" while diverting the natural flow around
the site during construction. These types of open trenched
crossings are isolated using flume or dam and pump techniques
(see Pipeline Associated Watercrossings, 2005 at
www.capp.ca/library/publications/
industryOperations/pages/pubInfo.aspx?DocId=96717).
The term "Dry Open-cut Stream Crossing" means a temporary
stream crossing work (e.g., trenched pipeline or cable
installation) that is carried out during a period when the entire
stream width is seasonally dry or is frozen to the bottom.
The risks to fish and fish habitat associated with isolated open cut
stream crossings include the potential for direct damage to
substrates, release of excessive sediments, loss of riparian habitat,
stranding of fish in dewatered areas, impingement/entrainment of
fish at pump intakes, and disruption of essential fish movement
patterns. Similarly, dry open-cut stream crossings pose a risk to
fish and fish habitat due to potential harmful alteration of
substrates, loss of riparian habitat, and release of excessive
sediment once stream flows resume.
The order of preference for carrying out a cable or pipeline
stream crossing, in order to protect fish and fish habitat, is: a)
punch or bore crossing (see Punch & Bore Crossings Operational
Statement); b) high-pressure directional drill crossing (see High-Pressure Directional Drilling Operational Statement); c) dry open-cut
crossing; and d) isolated open-cut crossing. This order must
be balanced with practical considerations at the site.
Fisheries and Oceans Canada (DFO) is responsible for protecting
fish and fish habitat across Canada. Under the Fisheries Act no
one may carry out a work or undertaking that will cause the
harmful alteration, disruption or destruction (HADD) of fish
habitat unless it has been authorized by DFO. By following the
conditions and measures set out below you will be in compliance
with subsection 35(1) of the Fisheries Act.
The purpose of this Operational Statement is to describe the
conditions under which it is applicable to your project and the
measures to incorporate into your project in order to avoid
negative impacts to fish habitat. You may proceed with your
isolated or dry open-cut stream crossing project without a DFO
review when you meet the following conditions:
- the project is not located on a Class A stream according to the
Alberta Water Act - Code of Practice, or on any water body inhabited by aquatic species that are listed as endangered or
threatened under the Species at Risk Act (SARA),
- for dry, open-cut crossings the watercourse is dry or frozen
completely to the bottom at the site,
- for isolated crossings, the channel width of the watercourse
at the crossing site is less than 5 meters from ordinary high
water mark to ordinary high water mark (HWM) (see
definition below),
- the isolated crossing does not involve the construction or
use of an off-stream diversion channel, or the use of earthen
dams,
- the isolated crossing ensures that all natural upstream flows
are conveyed downstream during construction, with no
change in quality or quantity,
- the site does not occur at a stream location involving known
fish spawning habitat, particularly if it is dependent on
groundwater upwelling,
- the use of explosives is not required to complete the
crossing, and
- you incorporate the Measures to Protect Fish and Fish
Habitat when Carrying Out an Isolated or Dry Open-cut
Stream Crossing listed below.
If you cannot meet all of the conditions listed above and cannot
incorporate all of the measures listed below then your project
may result in a violation of subsection 35(1) of the Fisheries Act
and you could be subject to enforcement action. In this case,
you should contact the DFO office in your area if you wish to
obtain DFO’s opinion on the possible options you should
consider to avoid contravention of the Fisheries Act.
You are required to respect all municipal, provincial and
federal legislation that applies to the work being carried
out in relation to this Operational Statement. The activities
undertaken in this Operational Statement must also comply
with SARA (www.sararegistry.gc.ca). If you have questions
regarding this Operational Statement, please contact the DFO
office in your area (see Alberta DFO office list).
We ask that you notify DFO, preferably 14 days before starting
your work, by filling out and sending the Alberta Operational
Statement notification form (http://www.dfo-mpo.gc.ca/regions/central/habitat/os-eo/provinces-territories-territoires/ab/os-eo20-eng.htm) to the DFO office
in your area. This information is requested in order to evaluate
the effectiveness of the work carried out in relation to this
Operational Statement.
Measures to Protect Fish and Fish Habitat when Carrying Out an Isolated or Dry Open-Cut Stream Crossing
- Use existing trails, roads or cut lines wherever possible as
access routes to avoid disturbance to the riparian
vegetation.
- Locate crossings at straight sections of the stream,
perpendicular to the banks, whenever possible. Avoid
crossing on meander bends, braided streams, alluvial fans,
active floodplains or any other area that is inherently
unstable and may result in the erosion and scouring of the
stream bed.
- Complete the crossing in a manner that minimizes the
duration of instream work.
- Construction should be avoided during unusually wet, rainy
or winter thaw conditions.
- While this Operational Statement does not cover the
clearing of riparian vegetation, the removal of select plants
may be necessary to access the construction site. This
removal should be kept to a minimum and within the utility
right-of-way or approved work space.
- Machinery fording a flowing watercourse to bring equipment
required for construction to the opposite side is limited to a
one-time event (over and back) and is to occur only if an
existing crossing at another location is not available or
practical to use. Operational Statements are also available
for Ice Bridges and Snow Fills, Clear-Span Bridges, and
Temporary Stream Crossing.
- 6.1. If minor rutting is likely to occur, stream bank and
bed protection methods (e.g., swamp mats, pads) should be used provided they do not constrict flows
or block fish passage.
- 6.2. Grading of the stream banks for the approaches should not occur.
- 6.3. If the stream bed and banks are steep and highly erodible (e.g., dominated by organic materials and silts) and erosion and degradation is likely to occur as a result of equipment fording, then a temporary crossing structure or other practice should be used to protect these areas.
- 6.4. Time the one-time fording to prevent disruption to sensitive fish life stages by adhering to appropriate fisheries timing windows (see Alberta Water Act - Code of Practice restricted activity periods, which can be found at: http://environment.alberta.ca/1411.html).
- 6.5. Fording should occur under low flow conditions and not when flows are elevated due to local rain events or seasonal flooding.
- Operate machinery in a manner that minimizes disturbance
to the watercourse bed and banks.
- 7.1. Protect entrances at machinery access points (e.g., using swamp mats) and establish single site entry and exit.
- 7.2. Machinery is to arrive on site in a clean condition and is to be maintained free of fluid leaks.
- 7.3. Wash, refuel and service machinery and store fuel and other materials for the machinery away from the water to prevent deleterious substances from entering the water.
- 7.4. Keep an emergency spill kit on site in case of fluid leaks or spills from machinery.
- Install effective sediment and erosion control measures
before starting work to prevent entry of sediment into the
watercourse. Inspect them regularly during the course of
construction and make all necessary repairs if any damage
occurs.
- Stabilize any waste materials removed from the work site,
above the HWM, to prevent them from entering the
watercourse. This could include covering spoil piles with
biodegradable mats or tarps or planting them with grass or
shrubs.
- Vegetate any disturbed areas by planting and seeding
preferably with native trees, shrubs or grasses and cover
such areas with mulch to prevent soil erosion and to help
seeds germinate. If there is insufficient time remaining in
the growing season, the site should be stabilized (e.g.,
cover exposed areas with erosion control blankets to keep
the soil in place and prevent erosion) and vegetated the
following spring.
- 10.1. Maintain effective sediment and erosion control
measures until re-vegetation of disturbed areas is achieved.
Measures to Protect Fish and Fish Habitat when Carrying Out an Isolated Crossing
Temporary isolation is used to allow work "in-the-dry" while
maintaining the natural downstream flow by installing dams up
and downstream of the site and conveying all of the natural
upstream flow into a flume, or pumping it around the isolated area.
In addition to measures 1 to 10, the following measures should be
carried out when conducting an isolated stream crossing:
- Time isolated crossings to protect sensitive fish life stages
by adhering to fisheries timing windows (see Measure 6.4).
- Use dams made of non-earthen material, such as waterinflated
portable dams, pea gravel bags, concrete blocks,
steel or wood wall, clean rock, sheet pile or other
appropriate designs, to separate the dewatered work site
from flowing water.
- 12.1. If granular material is used to build dams, use clean or washed material that is adequately sized (i.e., moderately sized rock and not sand or gravel) to withstand anticipated flows during the construction. If necessary, line the outside face of dams with heavy poly-plastic to make them impermeable to water. Material to build these dams should not be taken from below the HWM of any water body.
- 12.2. Design dams to accommodate any expected high flows of the watercourse during the construction period.
- Before dewatering, rescue any fish from within the isolated
area and return them safely immediately downstream of
the worksite.
- Pump sediment laden dewatering discharge into a
vegetated area or settling basin, and prevent sediment and
other deleterious substances from entering any water body.
- Remove accumulated sediment and excess spoil from the
isolated area before removing dams.
- Stabilize the streambed and restore the original channel
shape, bottom gradient and substrate to pre-construction
condition before removing dams.
- Ensure banks are stabilized, restored to original shape,
adequately protected from erosion and re-vegetated,
preferably with native species.
- If rock is used to stabilize banks, it should be clean, free of
fine materials, and of sufficient size to resist displacement
during peak flood events. The rock should be placed at
the original stream bank grade to ensure there is no infilling
or narrowing of the watercourse.
- Gradually remove the downstream dam first, to equalize
water levels inside and outside of the isolated area and to
allow suspended sediments to settle.
- During the final removal of dams, restore the original
channel shape, bottom gradient and substrate at these
locations.
- Pumped Diversions
Pumped diversions are used to divert water around the
isolated area to maintain natural downstream flows and
prevent upstream ponding.
- 21.1.Ensure intakes are operated in a manner that prevents streambed disturbance and fish mortality. Guidelines to determine the appropriate mesh size for intake screens may be obtained from DFO (e.g., Freshwater Intake End-of-Pipe Fish Screen Guideline (1995), available at www.dfo-mpo.gc.ca/Library/ 223669.pdf (PDF Version, 2.93 Mb)).
- 21.2. Ensure the pumping system is sized to accommodate any expected high flows of the watercourse during the construction period. Pumps should be monitored at all times, and back-up pumps should be readily available on-site in case of pump failure.
- 21.3. Protect pump discharge area(s) to prevent erosion and the release of suspended sediments downstream, and remove this material when the works have been completed.
Measures to Protect Fish and Fish Habitat when Carrying Out a Dry Open-Cut Stream Crossing
In addition to measures 1 to 10, the following measures should
be carried out when conducting a dry open-cut stream crossing:
- Stabilize the streambed and restore the original channel
shape, bottom gradient and substrate to pre-construction
condition.
- Ensure banks are stabilized, restored to original shape,
adequately protected from erosion and re-vegetated,
preferably with native species.
Definition:
Ordinary high water mark (HWM) – The usual or average
level to which a body of water rises at its highest point and
remains for sufficient time so as to change the characteristics
of the land. In flowing waters (rivers, streams) this refers to
the "active channel/bank-full level" which is often the 1:2 year
flood flow return level. In inland lakes or wetlands, it refers to
those parts of the water body bed and banks that are
frequently flooded by water so as to leave a mark on the land
and where the natural vegetation changes from predominately
aquatic vegetation to terrestrial vegetation (excepting water
tolerant species). For reservoirs this refers to normal high
operating levels (Full Supply Level).