Practitioners Guide to the Risk Management Framework for DFO Habitat Management Staff

3.0 Risk Management Framework

The Risk Management Framework is made up of three components which include Aquatic Effects Assessment (Section 3.1) Risk Assessment (Section 3.2) and Risk Management (Section 3.3). These components can be represented as a series of discreet steps embedded into the overall process applied by Practitioners to review development proposals (see Figure 1). An overarching principle which applies to all components of the Risk Management Framework is risk communication. Effective communication enables proponents and other stakeholders to understand the potential risks development activities pose to fish and fish habitat and the methods to avoid or minimize the risk to acceptable levels.

The initial steps to be considered before the Risk Management Framework can be applied include:

  • Operational Statement: Operational Statements define specific criteria and mitigation measures required to ensure development proposals can proceed without resulting in the harmful alteration, disruption or destruction (HADD) of fish habitat. Where necessary, Operational Statements have been regionalized to account for local environmental conditions and regulatory requirements. Where an Operational Statement can be applied, no further assessment is required.
  • Sufficient Information: There must be sufficient information to understand the nature of the development proposal in order to determine whether the habitat protection provisions of the Fisheries Act apply. Identification of information gaps early in the design and planning stages helps to ensure appropriate studies are conducted that ultimately support a well informed decision.
  • Fish Habitat Present: Under the Fisheries Act, "fish" includes parts of fish, shellfish, crustaceans, marine animals and any parts of shellfish, crustaceans or marine animals, and the eggs, sperm, spawn, larvae, spat and juvenile stages of fish, shellfish, crustaceans and marine animals. The Fisheries Act defines 'fish habitat' as spawning grounds and nursery, rearing, food supply and migration areas on which fish depend directly or indirectly in order to carry out their life processes. If there is no fish habitat present within the area of the develop proposal then no assessment is required.

Figure 1: Applying the Risk Management Framework to Decision making under the Habitat Protection Provisions of the Fisheries Act

3.1 Aquatic Effects Assessment

Aquatic effects assessment is a means of identifying the potential effects a development proposal may have on fish and fish habitat. Pathways of Effects (PoE) diagrams are used to describe development proposals in terms of the: activities that are involved, the type of cause-effect relationships that are known to exist; and the mechanisms by which stressors ultimately lead to effects in the aquatic environment. Each cause-and-effect relationship is represented as a line, known as a pathway, connecting the activity to a potential stressor, and a stressor to some ultimate effect on fish and fish habitat. Each pathway represents an area where mitigation measures can be applied to reduce or eliminate a potential effect. When mitigation measures cannot be applied, or cannot fully address a stressor, the remaining effect is referred to as a residual effect.

To support Practitioners a series of PoE diagrams were developed for common activities associated with a broad range of development proposals (Table 1).

Table 1: Activities for which Pathway of Effects (PoE) Diagrams have been developed

In-water Land-based
1. Industrial Equipment
2. Placement of Material
3. Flow Management
4. Fish Passage
5. Seismic
6. Water Extraction
7. Aquatic Vegetation Management
8. Structure Removal
1. Vegetation Clearing
2. Excavation
3. Industrial Equipment
4. Riparian Planting
5. Grading
6. Explosives
7. Cleaning or Maintenance
8. Livestock Grazing
9. Explosives
10. Dredging
11. Debris Management
12. Wastewater
13. Aquaculture

The PoE diagrams were developed in consultation with habitat biologists, engineers and scientists from across the country, in order to ensure that most of the known effects on fish and fish habitat were included. The PoE diagrams will be updated as additional activities and stressors are identified.

PoE diagrams can be used by both Habitat Management practitioners and proponents to:

  • review the potential effects of individual development proposals;
  • identify appropriate mitigation measures;
  • develop guidelines and best management practices; and
  • assess the effects of alternative design options.

Although the PoE diagrams may appear complex at first glance, they are actually quite simple to use, and by selecting the appropriate activities for a given development proposal they offer a clear picture of the overall potential effects of the proposed development on fish and fish habitat. It is important to note that the pathways are highly generalized and require Practitioners to apply expert judgment in determining with pathways apply in the geographic location of the proposed development activity. The purpose of the pathways is to enable Practitioners to have a common reference tool to explain to proponents which aquatic effects are of specific concern [see text box above].

3.1.1 Identify Relevant Activities (PoEs)

A proposed development may involve one or more of the activities shown in Table 1. Typically, the more complex the proposal, the more activities (and hence PoEs) are involved.

Example
Table 2 offers a few examples of how various stream crossing projects can be described by breaking them into their respective activities.

Table 2: Potential Pathways of Effects (PoEs) for Three Stream Crossing Proposals

Proposed Development Potential Pathways of Effect
1. New stream crossing involving excavation of the channel for installation of the structure Industrial Equipment
Placement of Material
Flow Management
Fish Passage
Water Extraction
Structure Removal
Explosives
Dredging
Debris Management
Wastewater
Vegetation Clearing
Excavation
Industrial Equipment
Riparian Planting
Grading
Explosives
2. New open-bottom stream crossing with no excavation of the channel and footings placed outside the natural channel width Debris management Vegetation Clearing
Excavation
Industrial Equipment
Riparian Planting
Grading
Explosives
3. Replacement of bridge decking Debris management Industrial Equipment
Cleaning or Maintenance
(of bridges or other
structures)

3.1.2 Assess Mitigation Measures

It is the proponent's responsibility to develop a mitigation plan and to demonstrate how the plan addresses potential effects on fish and fish habitat. Proponents can use the PoE diagrams to determine for themselves where mitigation is required, or conversely to summarize what residual effects are likely to result from the proposed development. In many instances, the Practitioner need only review the information to confirm its accuracy. PoE diagrams offer an effective way of itemizing potential stressors to ensure none are overlooked. This step in the process often requires interaction between the Practitioner and the proponent to clarify aspects of the proposed development or to offer advice on additional or alternative mitigation measures that may not have been considered.

Figure 2: Pathway of Effects Diagram for Vegetation Clearing

Figure 2 shows the PoE diagram that has been developed for Vegetation Clearing.

Example

Additional information is provided to allow for a PoE analysis to be conducted for one of the examples presented in Table 2.

New open-bottom stream crossing with no excavation of the channel and footings placed outside the natural channel width

  • The crossing structure will measure 15 metres in length
  • The development will involve the clearing of trees and shrubs on both sides of the stream channel for a distance of 20 metres upstream and downstream of the proposed crossing
    • Larger trees are to be cut by hand.
    • A bulldozer will clear remaining stumps and shrubs.
    • Trees attached to the streambank will be cut, but no in-water structures will be removed unless found within the footprint of the new culvert.
  • Silt fences to be installed along the edges of the watercourse.
  • Stream banks to be stabilized with rock rip rap.
  • Work to take place in the summer and expected to take 3 weeks to complete.

Using the PoE for Vegetation Clearing, a list of stressors and mitigation measures was developed (Table 3).

Table 3: Example of a Proponent's Mitigation Plan for Vegetation Clearing Adjacent to a Water Body

Stressor Cause and Effect Relationship Mitigation Measures Residual Effects
Use of Herbicides   The introduction of contaminants into the environment may lead to a variety of effects on fish and other aquatic organisms. Herbicides not required for this project. None
Addition or Removal of instream organic Structure   Removal of woody material from the stream channel may result in loss of cover/structure. Trees attached to bank will be cut, but no in-water structures to be removed unless found within the footprint of the new culvert. Possible removal of instream woody material within the areas occupied by the water crossing structure (15 meters).
Solar Inputs   The alteration of riparian vegetation may result in the loss of shade. No mitigation measures proposed. Potential increase in solar inputs for 40 meters of stream channel. Will be partially offset as new vegetative growth recolonizes.
Bank Stability and exposed soils   Loss of vegetation can lead to bank instability and exposed soils. No Mitigation measures proposed. Soils will be exposed within those areas cleared of vegetation - follow pathway to next level.
Bank Stability and exposed soils Increased Erosion Potential Exposed soils can lead to erosion and sediment entering the water. Loss of root material could lead to bank slumping. Silt fence installed along water course. Application of rock rip-rap on banks. No change in erosion potential.
Bank Stability and exposed soils Change in Habitat Cover and Structure Removal of undercut banks and overhanging woody material used as cover/structure for fish. Rock rip rap may provide some function as cover/structure. Change in stream bank composition from vegetation to rock rip rap along 40 meters of stream channel.
Allocthanous Inputs   Potential reduction in allocthanous inputs such as leaf matter and terrestrial insects. No mitigation measures proposed, although effect will be partially offset as native vegetation (grasses/shrubs) recolonizes. Loss in allocthanous inputs within those areas affected by streamside vegetative clearing. Will be partially offset as new vegetative growth re-colonizes

Based on the analysis presented in Table 3, the potential residual effects could be reported as follows:

  • Removal of instream woody material, streambank vegetation and allochthanous inputs within the footprint of the new culvert. (i.e. 15 meters).
  • Potential increase in solar inputs and loss of allochthanous inputs along 40 meters of stream. This will be partially offset as vegetation re-colonizes.
  • Change in streambank composition from vegetation to rock rip rap along 40 metres of stream.

Additional mitigation measures can reduce the residual effects even further:

  • The re-colonization of vegetation could be expedited through seeding or planting of shrubs.
  • Solar inputs could be reduced by retaining vegetation on the shade producing side of the stream.
  • The impact to streambank vegetation could be reduced by limiting the amount of rip rap, or preventing vegetation removal at the waters edge.

It is important to recognize that all residual effects are not necessarily negative. In this example, increased solar radiation could increase primary production.

While this example looked at the activity of vegetation clearing, a complete assessment would be required for all the activities identified in Table 2.

The analysis of potential residual effects is an important step in the assessment of a development proposal, but it is not until the residual effects are put into context (Section 3.2 ) that a level of risk can be determined.

Sources of uncertainty

There is always some level of uncertainty associated with predicting the residual effects that may result from a proposed development. Uncertainty can arise due to a lack of information, or in predicting the effectiveness of new or innovative mitigation measures. In addition, there may be synergistic effects whereby two or more effects in combination express an effect greater than they would have been expressed individually. These are difficult to identify and hence have the potential of being overlooked or underestimated.

The application of the precautionary principle within the federal government is described in detail in the document entitled A Framework for the Application of Precaution in Science-based Decision Making about Risk.

The application of the precautionary principle is widely accepted and applied within the federal government. Emphasis is placed on providing a sound and credible case that a risk exists, hence the need to refer to the Pathways of Effect as a source of information on the type of effects that commonly occur as a result of a development activity.

Acknowledging uncertainty does not preclude making sound management decisions, the uncertainty simply needs to be described and taken into consideration at the risk assessment stage.

3.2 Risk Assessment

Risk Assessment is the process used by Practitioners to determine the level of risk that residual effects pose to fish and fish habitat. To assess risk, one must consider the outcome of the aquatic effects assessment (i.e. the Scale of Negative Effect) in the context of the fish and fish habitat being effected (i.e. the Sensitivity of Fish and Fish Habitat). The Risk Assessment Matrix incorporates these two factors in order to characterize the level of risk the development proposal poses to the productive capacity of fish habitat. The rationale used to locate the residual effects on the matrix forms the basis for decision-making.

3.2.1 Determine Scale of Negative Effect

Attributes are used to scale residual effects on the y-axis of the risk assessment matrix. General qualifiers used to describe the attributes are described in Table 4.

Table 4: Attributes used to describe the scale of negative effects

Attribute Description Examples of scales used qualify the attributes (in increasing order)
1. Extent Refers to the direct "footprint" of the development proposal, as well as areas indirectly affected, such as downstream or down-current areas. Site or segment - localized effect Channel reach or lake region Entire watershed or lake
2. Duration The amount of time that a residual effect will persist. Short term (days) Medium term (weeks-months) Long term (multiple years - permanent)
3. Intensity The expected amount of change from the baseline condition. Intensity is a way of describing the degree of change, such as changes in water temperature, salinity, flow, suspended sediment etc. The timing of works may have a major influence on intensity. Effects such as sediment release occurring during critical spawning periods will have a higher intensity. Habitat still suitable but not as productive
Habitat quality significantly reduced
Habitat quality unusable

Example

Attributes can be used to describe the vegetation clearing example developed in Section 3.1.2.

Extent: 40 metres of stream channel affected by increased solar inputs. 55 metres of stream channel affected by reduced input of allocthanous materials, and change in cover/structure.

Duration: Reduction in allochthanous inputs and increased solar inputs to be reduced as natural vegetation re-establishes. Change in cover/structure due to placement of culvert and application of rock rip rap to persist indefinitely.

Intensity: The degree of change in solar and allocthanous inputs is unknown, lending to some degree of uncertainty in the prediction of Scale of Negative Effect.

Assuming there are no residual effects resulting from the other activities, this development proposal would generally be ranked Low on the Scale of Negative Effect. This decision is based on the fact that the footings will be located out of the wetted channel and that best management practices will be applied to avoid instream disturbance.

It is possible to use other attributes as well to describe effects. The purpose of this step is to identify the residual effects and to rank them on the y-axis of the risk assessment matrix.

3.2.2 Determine Sensitivity of Fish and Fish Habitat

The Sensitivity of Fish and Fish Habitat is represented by the x-axis of the Risk Assessment Matrix. Where available, regional fish and fish habitat classification systems may be used for the purposes of defining the x-axis of the risk assessment matrix. Of even greater value are watershed management plans that take fisheries management objectives into consideration and that integrate fish and fish habitat sensitivities into the plan. Where such plans are not available, additional information is required to determine the sensitivity of fish and fish habitat.

General qualifiers used to describe fish and fish habitat attributes are summarized in Table 5.

Table 5: Sensitivity of Fish and Fish Habitat

Attribute Description Scales for qualifying the attributes in freshwater ecosystems. These are ordered from low sensitivity to high sensitivity for each attribute.
1. Species Sensitivity Sensitivity of species to changes in environmental conditions, such as suspended sediments, water temperature or salinity. Species present are resilient to change and perturbation (e.g. many cyprinid species) Species present are moderately resilient to change and perturbation (e.g. pike, walleye and some cyprinids) Species present are highly sensitive to perturbations (e.g. many salmonidae)
2. Species' Dependence on Habitat Use of habitat by fish species. Some species may be able to spawn in a wide range of habitats, while others may have very specific habitat requirements. No use by fish Used as migratory corridor only; feeding, rearing Spawning habitat; habitat critical to survival of species
3. Rarity The relative strength of a fish population or prevalence of a particular type of habitat. Habitat/species is prevalent Habitat/Species has limited distribution confined to small areas Habitat/Species is rare e.g. Listed species under SARA.
4. Habitat Resiliency Habitat resiliency refers to the ability of an aquatic ecosystem to recover from changes in environment conditions. The flow and thermal regimes of the system as well as its physical characteristics are important considerations in describing freshwater ecosystems. Thermal regime
Thermal regime unsuitable for any fish species.
Warm water thermal regime suitable for cyprinids.
Cool water systems; coldwater systems that can buffer temperature changes
Cold water systems that cannot easily buffer temperature changes.

Physical characteristics
System is stable and resilient to change and perturbation
System is unstable and resilient to change and perturbation

Flow regime
Ephemeral - systems contain water only for short period after rain event
Intermittent - system contains water periodically
Permanent - system contains water year round

A red box labeled "Rare" located at the most highly sensitive end of the axis is meant to represent fish and fish habitats that are particularly rare and/or afforded special protection under the Species at Risk Act (SARA). The least sensitive extreme represents areas that are not considered fish habitat.

Example

Table 4 makes uses the above attributes for Sensitivity of Fish and Fish Habitat to develop two scenarios which are referred to in Section 3.2.3.

Table 6: Using Attributes to Describe Sensitivity of Fish and Fish Habitat

  Scenario A Scenario B
Species Present Cyrpinids and centrachids. Spring migration of northern pike and central mudminnow. Migratory runs of atlantic salmon. Sea-run and resident populations of brook trout.
Habitat Resiliency Area classified as a warmwater stream. Area classified as a coldwater stream. Watershed plan identifies groundwater upwelling in the area; only two such sites found within the entire watershed.
Species' Dependence on Habitat Habitat used to fulfill various life requirements of species present. Brook trout require upwelling areas to spawn. Nearshore vegetation used as cover for juvenile salmon and trout.
Rarity No rare species or habitat identified or expected. While the fish species are considered abundant in the watershed, the upwelling area could be limiting to production and therefore could be classified as rare.

Regional fisheries management objectives may have a profound influence over the ranking of different species and their habitats. In this hypothetical example Scenario A is ranked as Low Sensitivity while Scenario B is ranked as Highly Sensitive, due in large part to the presence of limited spawning habitat.

3.2.3 Categorize Risk (Using Risk Assessment Matrix)

Categorizing risk involves using the analysis which was done for determining the Scale of Negative Effect (Section 3.2.1) and the Sensitivity of Fish and Fish Habitat (Section 3.2.2) to plot a point on the Risk Assessment Matrix. The Risk Assessment Matrix is divided into four categories of risk: Low Risk, Medium Risk, High Risk and Significant Negative Effects (Figure 3).

Figure 3: Risk Assessment Matrix Used to Illustrate Various Categories of Risk

The Risk Assessment Matrix is used to categorize the level of risk of a development proposal on fish and fish habitat, using the residual effects that remain after the Aquatic Effects Assessement. The Risk Matrix is comprised of two axes.  One is labeled the Sensitivity of Fish and Fish Habitat and the other is the Scale of Negative Effect.  The Practitioner considers these two axes in order to locate the residual negative effects on the matrix.  The Risk Assessment Matrix is divided into four categories of risk: Low Risk, Medium Risk, High Risk and  Significant Negative Effects.  A red box labeled 'Rare' is located at the most highly sensitive end of the axis and represents fish and fish habitats that are particularly rare and/or protected under the Species At Risk Act.  The opposite end of the spectrum represents areas that are not considered fish habitat.

Sources of Uncertainty

It is important again to acknowledge the various sources of uncertainty that may be associated with predicting both the Scale of Negative Effect and the Sensitivity of Fish and Fish Habitat. Figure 4 shows how uncertainty could be illustrated on the Risk Assessment Matrix and how it might alter management decisions. Scenario A is represented as a tight circle to illustrate a relatively low level of uncertainty associated with both the Scale of Negative Effect and the Sensitivity of Fish and Fish Habitat. Despite some uncertainty, it does not influence the risk ranking or the resulting management decision. Scenario B represents the same development proposal located in Highly Sensitive habitat. With the limited information provided in Table 2 there was a high level of uncertainty predicting the Scale of Negative Effect. This uncertainty is represented as an oval which overlaps several risk categories. The level of uncertainty was reduced through additional information relating to the development proposal and the mitigation being proposed.

Figure 4: Risk Assessment Matrix Used to Illustrate Uncertainty
A. Low Risk project with little uncertainty associated with the risk assessment.
B. A high degree of uncertainty associated with predicting Scale of Negative Effect has led to an overlap of risk categories.

Figure 4: Risk Assessment Matrix Used to Illustrate Uncertainty A. Low Risk project with little uncertainty associated with the risk assessment. B. A high degree of uncertainty associated with predicting Scale of Negative Effect has led to an overlap of risk categories.

3.3 Risk Management

Once the risk to fish and fish habitat has been characterized, Practitioners can use the results to support and guide their decision on how to best manage the risk. The Risk Assessment Matrix provides an effective means through which to communicate those decisions to proponents and other stakeholders. The proponent always retains the option of considering additional mitigation measures including relocation and redesign as means of lowering the risk ranking (Figure 5). Figure 5 also describes the risk categories in terms of common management tools which Practitioners generally use to address the various levels of risk. The two most common risk management tools are: 1) letters advising proponents of their obligations to protect fish habitat and the means to do so, and 2) Fisheries Act authorizations , which also include conditions for monitoring, compensation and possibly even financial security. These conditions are generally commensurate with the level of risk associated with the proposed development.

Figure 5: Risk Assessment Matrix showing Common Management Tools and the Concepts of Relocation and Redesign

Figure 5: Risk Assessment Matrix showing Common Management Tools and the Concepts of Relocation and Redesign

3.3.1 Low Risk

Development proposals that are characterized as Low Risk are not likely to result in HADD, providing appropriate mitigation measures are applied. An appropriate management option in this case would be to issue a 'No HADD Likely as Proposed' letter (see Practitioners Guide for Writing Letters Used in Fisheries Act Reviews for DFO Habitat Management Staff). Letters should include a list of those mitigation measures that formed the basis of the decision, or direct proponents to the appropriate guidelines, or best management practices where applicable.

Development proposals where the effects are well understood and readily mitigable using standard measures, fit into this category. These are ideal candidates for developing streamlining tools such as Operational Statements or standardized advice on approved work practices.

Example

This would be an appropriate response for Scenario A as it was developed throughout this guide. The response letter would include:

  • Confirmation of details of the work as described in the plans,
  • Restating the proposed mitigation measures such as the sediment and erosion control plan,
  • The inclusion of other relevant conditions, such as timing the work to avoid interference with the migration or spawning of resident fish.

Habitat Protection Guidelines

Numerous habitat protection guidelines exist across the country which provide valuable information to proponents on design and mitigation options to avoid potential negative effects on fish and fish habitat. However, when referring proponents to guidelines, Habitat Management practitioners must specify clearly which designs or mitigation measures are required for activities to be in compliance with subsection 35(1) of the Fisheries Act. Without this clarity, proponents may be unsure which parts of the guideline specifically relate to their development proposal.

3.3.2 Medium Risk

Development proposals characterized as Medium Risk are likely to result in HADD, and a Fisheries Act authorization will be required. The purpose of the Medium Risk category is to recognize that some activities result in HADDs that are small-scale and/or temporary in duration, and have predictable outcomes with a low level of uncertainty surrounding potential negative effects. These works are usually routine in nature, which lends itself to the application of a streamlined authorization process. An example of a streamlined authorization process is the Class Authorization developed in Ontario for agricultural drain maintenance and in the Yukon for placer mining. Template authorizations that contain standardised conditions may also be used here.

3.3.3 High Risk

Proposed developments that are High Risk will result in HADD over a long period of time and/or a broad geographic extent, and/or will take place in areas ranked high on the Sensitivity of Fish and Fish Habitat scale. Such development proposals will require a site-specific review and authorization under subsection 35(2) of the Fisheries Act. Within these authorizations, conditions concerning mitigation measures, compensation, monitoring, and financial securities should be commensurate with the level of impact associated with the project. For more information on conditions concerning financial security, including letters of credit and habitat compensation, refer to the Practitioners Guide to Habitat Compensation, Practitioners Guide to Writing a subsection 35(2) Fisheries Act authorization and the Practitioners Guide to Letters of Credit.

Example

Scenario B, as it was developed throughout this guide, represents a project which would be ranked as High Risk, due in large part to the presence of spawning habitat that is potentially limiting to local fish populations. The level of risk could be reduced through relocation or redesign. If an authorization were to be issued, a compensation plan would need to be developed to offset losses in productive capacity.

3.3.4 Significant Negative Effects

Proposed developments with significant negative effects are those in which the residual effects are so large and/or the fish or fish habitat is of such importance that it cannot be adequately compensated. Practitioners would issue a letter that advises the proponent that the proposed development will result in unacceptable HADD and outline the rationale why an authorization cannot be issued. Where applicable, Practitioners should recommend relocation and redesign as possible options to reduce the level of risk. In either of the scenarios presented in this guide, the presence of a Species at Risk would initially elevate the development proposal to the Significant Negative Effects category. If after having considered the available recovery plans and/or allowable harm assessment where available, it may be concluded that the effect is acceptable, respecting any additional regulatory requirements that may also be required.

A referral or proposed development that may result in Significant Negative Effects will likely be considered a "Major Project" by the Habitat Management Program (even if there is no environmental assessment required), as indicated in the Major Project Criteria (November 2005). Such a "Major Project" would be managed by the Regional Manager of Environmental Assessment and Major Projects with guidance provided by the Environmental Assessment and Major Projects Branch in NHQ.

Further, specific decisions relative to major projects are detailed in "Decision Authority Protocols" which indicate the level of approval of key decisions. Practitioners must ensure that decisions related to proposed developments with Significant Adverse Effects are approved by the Decision Authorities identified in the Protocols before advising proponents.